How to Start Up Your Lawn Sprinkler System: A Step-by-Step Guide
A spring startup should answer three questions: Is the system ready to receive water? Does every zone operate correctly? Is the schedule appropriate for current conditions? Use the sequence below as an inspection guide, and follow the manuals for your particular shutoff, backflow equipment, pump, and controller.
1. Identify the equipment before operating it
Find the irrigation shutoff, controller, accessible valve boxes, and any equipment disconnected for winter. Review the shutdown notes. If a valve is unlabeled or the backflow arrangement is unfamiliar, arrange help rather than testing handles at random.
Check that the water supply is available and ground conditions permit startup. Rain Bird’s spring checklist warns against startup in frozen ground and advises gradual restoration of water to reduce pressure surges.

2. Inspect visible components
Look for cracked exposed fittings, displaced heads, damaged wiring covers, and open connections. Note any recent excavation. Make sure service areas are accessible. Do not energize damaged or wet electrical equipment.
If a pump or backflow device needs a separate recommissioning procedure, have it handled according to its instructions and applicable service requirements. This general checklist does not replace that work.
3. Restore water according to the system’s procedure
Once the system is ready, restore supply carefully and observe accessible components for leakage. Stop if water escapes unexpectedly. Do not leave a suspect system pressurized while you investigate something elsewhere in the yard.
For an unfamiliar setup, a professional startup inspection can help establish a clear record for future seasons.
4. Test one station at a time
Use a short manual test from the controller and record the area served by each station. Check spray direction, rotor movement, pooling, and weak coverage. Watch the zone stop before moving on. Test drip zones as well as the lawn.

Use head repair for damaged sprinklers, valve diagnosis for switching problems, and leak service for escaping water. Note symptoms before deciding which part must be replaced.
5. Set the seasonal schedule
Check the date, time, active programs, start times, and station durations. Confirm rain-delay and sensor operation from the manual. Keep a copy of the settings.
Use the current Utah watering guide and local provider rules. Our watering-frequency article explains how measured output translates into run time. A successful test does not mean automatic watering must begin immediately.
6. Recheck and keep a record
Observe the next scheduled cycle and note any delayed leaks or unexpected repeat starts. Save the zone map and repair list with your controller information. Call (435) 760-0827 for local help, or find another branch in the Sprinkler Master directory.
